2003-2013 | 2013-2017 | 2018 | |
---|---|---|---|
RND | |||
Pilot Plant | |||
Production Plant-1 | |||
Production Plant-2 | |||
Production Plant-3 | |||
Production Plant-4 |
RND | PPD | PRD-1 | PPD-2 | PRD-3 | PRD-4 | Total | |
---|---|---|---|---|---|---|---|
Area (Sq. Feet) | 3500 | 3500 | 9900 | 2000 | 6000 | 27000 | 47000 |
Purpose | Product Development | Product scale and small scale production | Production, powder processing area | Hydrogenation | High Vacuum distillation | Production, powder processing area | |
Operating Volume KL | 4 Synthesis Lab, 16 Fume Hood | 4 | 27 | 4 | 20 | 103 | 158 |
Operating Temp | -70 to 220 deg C | -70 to 220 deg C | -70 to 220 deg C | -10 to 120 deg C | 30 deg to 220 deg C | -10 to 130 deg C | |
Operating Pressure | up to 12 kg/cm2 | up to 12 kg/cm2 | up to 3 kg/cm2 | up to 12 kg/cm2 | up to 3 kg/cm2 | up to 3 kg/cm2 | |
Operating Vacuum | up to 0.01 mm Hg | up to 0.01 mm Hg | up to 720 mm | up to 720 mm | up to 0.01 mm Hg | up to 720 mm | |
Clean Room | NA | NA | 1 PPA (1350 Sq. Feet) | 1 LPA (800 Sq. Feet) | 3 PPA (1350 Sq. Feet) |